Preface

Electromagnetic compatibility (EMC) is an index to test the characteristics of equipment or system in the electromagnetic environment. The EMC level of electronic products needs to pass a series of standardized EMC evaluation 1-2 tests. In order to enable electronic products to reproduce the same EMC test conclusion and its ability to have the same EMC level in similar electromagnetic environment, relevant fields or enterprises have established standardized rules and regulations or specifications for electronic products, including equipment installation and configuration requirements. EMC equipment that conforms to this regulation or specification, such as test level and method, can be called EMC equipment.

When the installation and users of electronic products expand to the global industry, does the equipment still have electromagnetic compatibility because of different installation standards, different user habits and different electromagnetic environment? The self-evident conclusion is doubtful.


1. Reasons for formation of non-standard EMC

Taking the current industrial electronic products as an example, in order to meet the practicability and strong electromagnetic compatibility level, the field EMC including test specifications, EMC assembly equipment and application specifications 5 - have been developed. Generally, it has the characteristics of universality and ideality:

1) EMC laboratory test and evaluation environment;

2) EMC test is that the equipment installation configuration requires good system grounding:

3) The shield layer of shielded cable for sensitive high-speed signal is well grounded.

However, different customers may have one or more deviations between the actual application and the ideal environment due to the actual application cost, limited assembly and other factors:

① There is no grounding point at the equipment installation site;

② The power supply is not grounded or cannot be grounded:

③ Cables are particularly sensitive. High-speed signal cables are not shielded, or shielded but not grounded.

The above and standard EMC non-standard configuration is called non-standard configuration EMC configuration. The EMC evaluation and detection of this non-standard EMC corresponding configuration is called non-standard EMC non-standard test EMC test results are the carrier of the equipment EMC design and rectification measures are called non-standard EMC measures.


Many standard EMC machines operate normally in electromagnetic environment. In non-standard environment, EMC may operate abnormally under equipment, and even cause hardware damage. The resulting customer returns, repairs and even claims have caused huge losses to equipment manufacturers. Therefore, the above non-standard evaluation of the electronic design EMC of the machine should also note that EMC has improved the specific level of electromagnetic compatibility. It is recommended to improve the equipment EMC in the weak configuration and equip it with certain EMC tests. You can refer to one or more of the following worst problems:

① Ungrounded all equipment systems:

② All cables shall be unshielded:

③ Same power supply.

The EMC evaluation and evaluation test for the development of electronic products should first be standardized EMC test, and then non-standard EMC test. If there are major improvement measures during the test, such as capacitance (reference point and location of the internal area of the equipment) PE (bridging Y capacitance between power protection areas, bridging capacitance between different areas) modification of parts or capacitance values, changes of important or sensitive components, etc., Retest 7 in the above order.

This article mainly discusses non-standard EMC equipment after the equipment or cable is not grounded, because the external world has caused greater changes in EMI (interference signal), such as the impact on RE (radiation disturbance), CE (transmission and transmission), so it has no reference significance for the evaluation of EMI test results in non-standard EMO equipment, which is not discussed in relevant EMI evaluation and analysis articles


2. Non-standard EMC dry analysis test

During EMC test, the influence current of lotus syringe can be regarded as water flow. When an electronic product is introduced, it can be discharged from one or more other power supplies or cable sockets. The water flow (influence) can only enter the low altitude, and the water inflow is equal to the water flow. The total water flow is stable, and the total energy affected by EMC is one CU, in which C is the energy storage capacity of the interference source of EMC test instrument; U is EMC test voltage, the same as

Most EMC tests include common mode interference such as electrostatic discharge, electrical transient pulse set, common mode surge, conducted immunity, etc. During the standardized EMC test, the common mode interference current flows back from the ground point to the reference ground plate. Instead of the standard EMC test, the common-mode interference current flows through the cable, and the PCB (printed circuit board) and other facilities return to the reference grounding plate through the parasitic capacitance of the earth. The differential-mode interference, such as the differential-mode surge, standard or non-standard EMC test, is equal, so that it can be introduced into one end under the influence of the test equipment, and then discharged from the other end. The more flat the channel water flow (the lower the impedance or the greater the generated capacitance), the more. Fluctuation on the channel is the root cause of EMC error.

As shown in Figure 1, the influence of current passing through the ground leads to ground impedance fluctuation, i.e. voltage drop AU. If AU equipment is used, it may have a fault exceeding the digital circuit 01 transformation threshold voltage.

The EMC test is standardized because the impedance of the equipment PCB ground plane and the impedance from the plane to the ground point (drain) are the minimum. Most of the water flow (influence) passes through the ground plane, so the fluctuation is usually caused by the current passing through the ground plane. Instead of the standard EMC test, there is no grounding point (i.e., the specification (EMC drain), and the water flow (impact) in the equipment is different from that in the specification.

霍達爾儀器

Figure 1. Drop caused by interference on PCB


In the process of non-standard detection, EMC will affect the introduction of power or signal cables, because there is no direct return ground point, and the affected current will return to the reference floor or ground in the path shown in Figure 2:


霍達爾儀器

Figure 2. Interference current path in non-standard EMC test


① According to the parasitic capacitance from the power or signal cable to the reference floor or ground, this path has no direct relationship with the operation of the machine;

② According to one or more test equipment PCBs, the parasitic capacitance of the reference floor or the earth is coupled to the ground;

③ This method is only applicable to equipment with plastic shell or metal frame. First, the parasitic capacitance of the plastic shell or metal frame is passed through the equipment PCB, and then the parasitic capacitance is connected to the parasitic capacitance through the plastic shell or metal frame;

④ Close the signal or power cable through the PCB and then through the capacitor and the protective device (such as TVS) near the signal or power cable socket, and then through the parasitic capacitance of the cable to the reference floor or the earth. When the cable is in place according to the configuration requirements of the cable EMC test standard higher than the configuration requirements of the reference floor 10 cm insulation support, 1m according to the parasitic capacitance of the ground floor, the long cable is estimated to be about 500. PF Generally, the standard cable length is 5m, and its parasitic capacitance is about 250pF. When the PCB board with the specification of 10cmx20cm is placed 10 cm away from the reference ground plate, the parasitic capacitance between it and the reference ground plate is estimated to be about 10 pF.

When the cable is placed on the insulated support 10cm higher than the reference ground plate according to the configuration requirements of EMC test standard, the parasitic capacitance of 1m long cable to the reference ground plate is estimated to be about 50 pF. Generally, the cable length is 5m, and its parasitic capacitance is about 250 pF. When the PCB board with the size of 10cmx20cm is placed 10 cm high from the reference ground plate, the parasitic capacitance between it and the reference ground plate is estimated to be about 10 pF.

The parasitic capacitance of the power and signal cables to the reference ground plate is far greater than that of the PCB, so most of the interference current flows out from the parasitic capacitance of the cable to the reference ground plate or the ground, and a few of the interference current flows out from the PCB in the way of spatial coupling. Therefore, EMC test needs to consider the fourth way: more interference current flows through the entire PCB, which may cause EMC risk.


相關關鍵詞: EMCEMC測試電磁兼容
Copyright ? 深圳市霍達爾儀器有限公司 備案號:粵ICP備18007893號 百度統計 站點地圖
技術支持:神州通達網絡
首頁
電話
留言
青青一区二区三区_亚洲一区不卡在线_狠狠爱综合网_38少妇精品导航
99精品欧美一区| 色八戒一区二区三区| 久久久精品免费免费| 国产一二精品视频| 欧美国产禁国产网站cc| 成a人片亚洲日本久久| 亚洲欧洲性图库| 91国产福利在线| 日韩精品视频网| 精品国产乱码久久久久久免费 | 成人av动漫网站| 有码一区二区三区| 欧美日韩视频在线第一区| 免费成人深夜小野草| 久久综合九色欧美综合狠狠| 国产91在线看| 一区二区三区精品| 91精品国产综合久久久久久久 | 久久精品一区二区三区不卡牛牛| 懂色av一区二区夜夜嗨| 亚洲精品国久久99热| 这里只有精品免费| 国产精品一区在线观看乱码 | 一本大道久久a久久精二百| 午夜精品福利久久久| 精品乱码亚洲一区二区不卡| 成人在线一区二区三区| 亚洲午夜国产一区99re久久| 日韩欧美视频一区| av在线免费不卡| 爽好多水快深点欧美视频| 久久综合狠狠综合久久激情| 91丝袜美女网| 麻豆精品国产91久久久久久| 亚洲国产精品成人综合色在线婷婷| 色综合视频在线观看| 日韩国产欧美在线播放| 中文字幕第一页久久| 欧美日韩一区三区四区| 国产黄色成人av| 亚洲国产精品一区二区尤物区| 精品久久久影院| 一本色道久久综合亚洲aⅴ蜜桃 | 美女精品一区二区| 自拍av一区二区三区| 日韩欧美久久久| 91丨porny丨国产| 久久99精品久久久久久久久久久久 | 欧美久久高跟鞋激| 成人免费视频国产在线观看| 日韩精品一级二级| 综合欧美一区二区三区| 欧美本精品男人aⅴ天堂| 色就色 综合激情| 国产激情一区二区三区四区| 五月婷婷激情综合网| 亚洲国产精品t66y| 日韩一级成人av| 在线国产电影不卡| 国产精品亚洲一区二区三区妖精| 亚洲成人免费视频| 国产精品免费视频网站| 日韩欧美在线一区二区三区| 91麻豆swag| 国产99久久久国产精品免费看 | 日韩一本二本av| 在线观看免费视频综合| 国产白丝精品91爽爽久久| 日产精品久久久久久久性色| 亚洲免费观看视频| 国产欧美一区二区精品性色超碰 | 91啪亚洲精品| 国产高清在线精品| 六月丁香综合在线视频| 亚洲第一二三四区| 亚洲人成在线播放网站岛国| 国产日韩视频一区二区三区| 日韩欧美一区在线观看| 欧美色精品在线视频| www.66久久| 国产精品 欧美精品| 久久99久久久欧美国产| 亚洲成人午夜电影| 一区二区三区小说| 自拍偷拍国产亚洲| 国产精品激情偷乱一区二区∴| 精品国产免费人成在线观看| 91精品国产综合久久久久久久久久 | 成人免费福利片| 国产一区在线观看视频| 麻豆免费看一区二区三区| 日韩黄色一级片| 午夜精品久久久久久久| 亚洲国产精品尤物yw在线观看| 亚洲人成在线播放网站岛国 | 亚洲午夜一区二区三区| 有码一区二区三区| 亚洲欧美偷拍另类a∨色屁股| 国产精品视频麻豆| 欧美激情艳妇裸体舞| 久久久久国色av免费看影院| 欧美成人一区二区三区| 日韩欧美一级二级| 日韩色在线观看| 日韩欧美一二三| 欧美成人精品3d动漫h| 欧美大片免费久久精品三p| 欧美一级日韩免费不卡| 日韩亚洲欧美一区| 日韩视频免费观看高清在线视频| 欧美一区二区成人6969| 欧美一三区三区四区免费在线看| 777精品伊人久久久久大香线蕉| 欧美日韩日本视频| 制服丝袜亚洲色图| 日韩欧美视频在线| 亚洲精品一区二区三区影院| 久久综合久久综合九色| 久久精品欧美日韩| 国产肉丝袜一区二区| 中文字幕+乱码+中文字幕一区| 亚洲国产精品av| 成人免费小视频| 一区二区三区四区激情 | 亚洲伊人色欲综合网| 亚洲国产精品久久人人爱| 五月天一区二区| 麻豆一区二区三区| 国产成人鲁色资源国产91色综| 丁香六月综合激情| 91免费观看在线| 精品视频一区二区三区免费| 欧美一区二区三区四区视频| 精品日产卡一卡二卡麻豆| 久久久99久久精品欧美| 国产精品久久久久久久久搜平片| 亚洲美腿欧美偷拍| 亚洲成人午夜电影| 久久se精品一区精品二区| 国产黑丝在线一区二区三区| 97成人超碰视| 欧美日韩精品一区二区天天拍小说| 欧美一区二区三区四区在线观看| 欧美精品一区二区三区一线天视频 | 男女男精品视频网| 国产成人自拍高清视频在线免费播放| 懂色av一区二区三区蜜臀| 日本韩国精品在线| 欧美一区二区播放| 中文一区在线播放| 亚洲一区二区三区自拍| 久久不见久久见免费视频7| 懂色av一区二区夜夜嗨| 欧美三日本三级三级在线播放| 日韩精品一区二区三区在线观看| 欧美国产日韩亚洲一区| 亚洲午夜一区二区| 国内国产精品久久| 色综合天天综合| 日韩欧美国产高清| 中文字幕精品在线不卡| 亚洲成a人v欧美综合天堂下载| 韩国成人福利片在线播放| 99热国产精品| 欧美一区二区三区在线看 | 国产免费成人在线视频| 亚洲香蕉伊在人在线观| 国产毛片一区二区| 欧美性大战久久久久久久| 久久美女艺术照精彩视频福利播放| 综合久久久久久| 蜜桃精品在线观看| 99精品桃花视频在线观看| 欧美一级生活片| 亚洲三级在线免费观看| 蜜桃av一区二区| 色婷婷综合中文久久一本| 欧美va亚洲va香蕉在线| 亚洲欧美日韩在线不卡| 精一区二区三区| 欧美亚洲日本国产| 欧美国产亚洲另类动漫| 日韩国产高清在线| 色一情一乱一乱一91av| 久久综合视频网| 午夜影视日本亚洲欧洲精品| 成人免费的视频| 欧美va天堂va视频va在线| 一区二区欧美视频| 国产成人精品一区二| 在线不卡免费av| 亚洲欧美国产77777| 国产一区二区三区四 | 欧美狂野另类xxxxoooo| 国产精品嫩草影院com| 精品亚洲国产成人av制服丝袜| 欧美在线三级电影| 国产精品萝li| 国产综合久久久久影院| 欧美日韩国产电影|